400-0755-631
English
Research

Expand

Home -  Research - Smart Factory
Efficient Production - Adequate Capacity and Rapid Response
01
3 production workshops
02
More than 30 lean, semi automated, and automated production lines
03
14 day new product development and design cycle
04
25 day new product prototype manufacturing
05
7-day fast sample manufacturing of existing standard models
06
20 day mass production of standard models and rapid batch delivery
07
Standardization and generalization of components, machine molds, fixtures, and equipment production lines
08
Integrated application of PDMS system and EPR system
Efficient Production - The Wave of Automation
The Equipment Engineering and Automation Department has the ability to independently develop automation equipment, programs, and specialized fixtures, and can quickly respond to customized needs. Optimizing production processes through automated programs, improving equipment utilization and process consistency, and assisting factories in transitioning towards digitization and intelligence.
Quality Assurance
Quality Strategy and Quality Assurance System for Constant Drive Motors
Professional Quality Team

Quality Engineer (QE): Responsible for standard setting and process optimization

Quality Assurance (QA):Supervise the implementation of the system and compliance

Quality Control (QC):Implement full process inspection

Standardized management system

Strictly implement; ISO 9001  And  IATF 16949 (formerly TS 16949); quality management system

Fully implement  7S on-site management ensures efficient and standardized production environment

Continuous improvement mechanism

Cross departmental Improvement Team (CFT): Integrating resources from quality, engineering, production, and other departments to promote systematic optimization

Special research and development team: such as:

-Focus on optimizing key processes, equipment, and fixtures
-Brushless motors for household appliances; Ultra quiet optimization
-Personal care motor; PCBA online detection yield improvement
-Four head winding machine; Improvement of leakage problem
Whole process quality control

R&D stage:FMEA (Failure Mode Analysis)  +  PPAP (Production Part Approval Procedure) +  CPK (Process Capability Control)

Incoming Material Control:Sample Evaluation (SER)  +  Strict IQC inspection

Production process:Operator self inspection  +  IPQC inspection

Shipping Guarantee:OQC Finished Product Sampling  +  Real time monitoring of quality dashboard

Warehouse Department - Lean Inventory Control
By integrating intelligence and lean management, efficient, precise, and low-cost logistics management can be achieved, providing strong support for production and delivery.
Free Consultation Hotline
400-0755-631
Sales Service Hotline
86-755-29169191
Headquarters Address
Building A & F, Funing Hi-Tech Industrial Park, Xintian Road, Fuhai Street, Bao'an District, Shenzhen, Guangdong Province, China.